In this page:

How to promote a project to to include its changes in the next SNOMED CT release. This process updates the project mainline with the changes made at the project level, which can then be shared with other projects via their subsequent rebase from the mainline.

Project-level Service Acceptance Criteria (SAC) must be satisfied to enable project promotion. These are defined within the project SAC configuration by those with the PROJECT_MANAGER access role.


StepsReferences

Project-level SAC are presented in two lists within the Acceptance Criteria accordion-control section, located below the Project Details and above the Classification Results section of the Project View.

Automatic Project-level SAC are listed to the left, with Manual Project-level SAC to the right.

Automatic SAC have a yellow warning triangle icon if not yet met, and a green tick if their automated system checks confirm they are satisfied.

Manual SAC are presented initially as open checkboxes, each of which can be interactively checked (green-ticked) when the user's role-based access permissions match those configured for that SAC control.

Particular manual SAC require a specific role to be able to sign-off, such as PROJECT_LEAD, so more than one person may be needed to get all SAC satisfied.

SAC Definitions and Acceptance Roles

With more frequent delivery of SNOMED CT releases, project-level SAC are an essential aspect of the International Edition content quality control process. However, it is technically feasible for projects not to have project-level SAC defined, and some may have manual SAC but no Automated SAC or vice versa. Project-level (and task-level) SAC definitions can be set by those who have the PROJECT_MANAGER role, usually in close consultation with those in the PROJECT_LEAD and RELEASE_LEAD roles. Individual user accounts may also be granted more than one access control role (via membership of the appropriate access control groups).


When all mandatory project-level SAC are satisfied, the project is not diverged, and the project configuration enables promotion, the Promote button will be active for those with the PROJECT_LEAD role.


Press Promote to promote its contents to the mainline branch.