Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

In this page:

How to promote a project to to include its changes in the next SNOMED CT release. This process updates the project mainline with the changes made at the project level, which can then be shared with other projects via their subsequent rebase from the mainline.

Project-level Service Acceptance Criteria (SAC) must be satisfied to enable project promotion. These are defined within the parent project SAC configuration by those with the PROJECT_MANAGER access role.


StepsReferences

Project-level SAC are presented in two lists within the Acceptance Criteria accordion-control section, located below the Project Details and above the Classification Results section.

Automatic Task-level SAC are listed to the left, with Manual Task-level SAC to the right.

Automatic SAC have a yellow warning triangle icon if not yet met, and a green tick if their automated system checks confirm they are satisfied.

Manual SAC are presented initially as open checkboxes, each of which can be interactively checked (green-ticked) when the user's role-based access permissions match those configured for that SAC control.

Although project-level SAC are an essential aspect of the International Edition content quality control process, some projects may not have project-level SAC defined.


  • No labels